The Conrad Hotel on 750 New York Ave NW

Location: Washington, DC
Owner: Hilton Worldwide
Size: 413,000 sf
Cost: $250 million

The Conrad represented the second phase of CityCenterDC, a 2.5 million sf mixed-use development on a 10-acre site in the heart of Washington, D.C. In addition to the 360-room five star hotel, the site includes luxury ground floor retail space.

FMC provided the following construction materials testing and inspections services:

  • 3D and movement monitoring 

  • Soils backfill compaction testing 

  • Foundation bearing capacity 

  • Deep foundations including pile testing 

  • Structural masonry

  • Cast-in-place concrete and reinforcement steel

  • Structural steel installation

  • Fireproofing 

  • Precast concrete panel installation