Bard High School Early College DC
Location: 1351 Alabama Ave SE, Washington, DC 20032
Owner: Department of General Services (DC)
Size: Coming Soon
Cost: Coming Soon
Completion date: 2022
The Bard High School Early College Modernization project is located at the former Malcolm X Building at 1351 Alabama Ave SE, Washington, DC 20032. The Scope of services includes, but is not limited to, field and laboratory testing of soil, rebar, concrete, masonry, and structural steel installation required for the complete renovation of the existing building and demolition work down to the existing concrete structure.
The existing building consists of a 4-story structure attached to a 1-story structure. A portion of the existing one-story building along Alabama Ave will be completely demolished, and a new steel structure with concrete footings will be built to accommodate the new gymnasium. The existing building exterior walls will be completely removed and replaced with an energy-efficient building envelope as per the DCRA third-party special inspection services requirements.
FMC provided construction materials testing and third-party inspection services.